Material |
|
4″ Square Heavy Steel pipe for elivated and extension to board |
|
|
Hevy steel pipe base trolley frame with weight 400 kgs on each post |
Board |
|
Acrylic A grade as per FIBA standard 20 mm |
|
|
Back frame heavy steel pipe 25x50mm |
Paint |
|
All powder coated for extra outdoor life |
Rings |
|
Dunking Three spring mechanism 20mm Solid |
Ring Net |
|
White or Tri colour 6mm heavy duty Nylon Net |
Padding |
|
Three Side padding for proteciton as well as |
|
|
padding on Acrylic board in U Shape |
|
|
Waterproof Plywood with 50mm EP Foam |
|
|
Covered with Non Tearing Vinyl fabric for |
|
|
long life |